Turbine/Hydraulic Generator Set/Hydraulic Generator Set

A. Product Description:Porject NameMafanggou I HEPP, SichuanWater Head236mCapacity3×8000kwTurbine Model2xCJA475-W-122/3x11.8Generator ModelSFW8000-12/2600B. Parts of Projects for Reference:Outstanding Projects1Own 15 patents for Pelton Turbine.2Have the capability of calculating and developing the core technology of bucket

Featured Products

A. Product Description:
Porject NameMafanggou I HEPP, Sichuan
Water Head236m
Capacity3×8000kw
Turbine Model2xCJA475-W-122/3x11.8
Generator ModelSFW8000-12/2600
Pelton Turbine/ Hydro Turbine Generator Unit/ Water Turbine Generator UnitPelton Turbine/ Hydro Turbine Generator Unit/ Water Turbine Generator Unit
B. Parts of Projects for Reference:
Outstanding Projects
1Own 15 patents for Pelton Turbine.
2Have the capability of calculating and developing the core technology of bucket linear of pelton turbine runner.
 
1The highest water head pelton turbine till 2018 in Asia 
TianHu HEPP, Guilin, Guangxi (Water Head: 1070M, Unit Capacity: 15MW)
2The four-nozzles vertical shaft set pelton turbine with high water head & high capacity in China
Xiaogou HEPP, Kangding, Sichuan (Water Head: 938M, Unit Capacity: 27MW)
3The First horizontal six-nozzles set pelton turbine in China
Mahuanggou HEPP, Baoxing, Sichuan (Water Head: 236M, Unit Capacity: 8MW)
4The Biggest horizontal pelton turbine set till now in China
Lianghekou HEPP, Kangding, Sichuan (Water Head: 432M, Unit Capacity: 15MW)
5The First vertical five-nozzles set pelton turbine in China
Wangbao HEPP, Jiulong, Sichuan (Water Head: 185M, Unit Capacity: 6.3MW)
6The First vertical six-nozzles set pelton turbine in China (turbine runner is designed and manufactured by Lisong)
Gequhe II HEPP, Qinghai (Water Head: 374M, Unit Capacity: 27MW)
7Vertical francis turbine (The distrubitor and runner has not been replaced for 8 years till now).
Furonghe HEPP, Guilin (Water Head: 200M, Unit Capacity: 12.5MW)
Horizontal Single Runner 1 Nozzle Pelton Turbine
No.Name of plantCapacityHead WaterTurbine ModelGenerator ModelCompleted
 time
(KW)(M)
1Xiangling HEPP, Sichuan2x2500410CJA237-W-135/1×10.5SFW2500-10/17302004.01
2Hejiazhai HEPP, Guizhou2x3200535CJA237-W-125/1×10SFW3200-8/17302004.11
3Shenyuehe HEPP, Sichuan2x3200570CJA237-W-125/1×9.5SFW3200-8/17302005.01
4Danikou III HEPP, Sichuan2x2500485CJA237-W-120/1×9.2SFW2500-8/17302005.02
5Daguan HEPP, Yunnan2x2500390CJA237-W-105/1×11SFW2500-8/17302005.03
6Menghe HEPP, Sichuan1x2500185CJA237-W-125/1×13.5SFW2500-14/17302007.07
7Dulanggou II HEPP, Sichuan2x2500390CJA237-W-130/1×11SFW2500-10/17302008.01
8Hongbagumu HEPP, Sichuan2x3200601CJ1050-W-130/1×9.0SFW3200-8/17302008.06
9Biaoshuiya HEPP, Yunnan2x2500625CJ1050-W-130/1×8.0SFW2500-8/17302008.07
10Aijiawan II HEPP, Guangxi2×3200516CJA237-W-120/1×10SFW3200-8/17302009.02
11Dulanggou I HEPP, Sichuan2×3000520CJA237-W-120/1×10SFW3000-8/17302009.03
12Lamudai III HEPP, Sichuan2×2000423CJA237-W-110/1×9SFW2000-8/17302009.06
13Qingshuihe HEPP, Sichuan2×2000313.5CJA475-W-118/1×12SFW2000-10/17302009.07
14Tuyuhe HEPP, Hubei2×2000902CJ1050-W-120/1×5SFW2000-6/14302009.09
15Chuba HEPP, Sichuan2×4000458CJ550-W-142/1×12.5SFW4000-8/28602010.04
16Landong II HEPP, Guilin3×3200415CJ475-W-125/1×12.5SFW3200-10/17302014.05
17Qingbei HEPP, Guilin2×2250273CJ475-W-110/1×13.5SFW2250-10/17302014.05
18Bugaotan HEPP, Guilin2×2250262CJ475-W-125/1×14SFW2250-12/17302015.05
19Sizhishan HEPP, Sichuan2×1600294CJ475c-W-110/1×12SFW1600-10/14302016.02
20Wayaosanchahe HEPP, Yunnan2×3200623CJ1050-W-133/1×9.0SFW3200-8/17302017.01
21Dagou HEPP, Sichuan2×4000900CJ1050-W-160/1×7.5SFW4000-8/17302019.01
Horizontal Single Runner 2 Nozzles Pelton Turbine
No.Name of plantCapacityHead WaterTurbine ModelGenerator ModelCompleted
 time
(KW)(M)
1Liyuhe HEPP, Yunnan2×6300590CJA237-W-128/2×9.5SFW6300-8/21502004.11
2DaihuangGou HEPP, Sichuan2×4000440CJA237-W-110/2×9SFW4000-8/17302004.01
3Liangchahe HEPP, Sichuan2×3200320CJA237-W-120/2×10.5SFW3200-10/17302005.01
4Lamahe HEPP, Sichuan1×5000685CJA237-W-140/2×7.0SFW5000-8/21502005.07
5Hongyan II HEPP, Guizhou2×4000486.6CJA237-W-118/2×8.5SFW4000-8/17302005.12
6Niujing HEPP, Sichuan2×3200315CJA237-W-120/2×10.5SFW3200-10/17302005.12
7Jiepaihe I HEPP, Yunan2×3200320CJA237-W-115/2×10.8SFW3200-10/17302006.01
8Fengdianhe II HEPP, Yunnan2×6300870CJ1050-W-120/2×6.8SFW6300-6/17302007.01
9Yongxing HEPP, Yunan2×4000350CJA237-W-100/2×10.5SFW4000-8/17302007.11
10Mugou I HEPP, Sichuan2×3200390CJA237-W-105/2×9SFW3200-8/17302007.12
11Qingshuihe HEPP, Sichuan2×3200220CJA475-W-116/2×13.5SFW3200-8/17302008.06
12Bata HEPP, Sichuan2×5000375CJA237-W-128/2×11.5SFW5000-10/21502008.07
13Chuba HEPP, Sichuan2×8300458CJ325-W-142/2×12.5SFW8300-10/26002008.09
14Lvshuitang HEPP, Yunan2×5000322CJA237-W-120/2×12.5SFW5000-10/21502008.11
15Fengxi HEPP, Chongqing2×3200271CJA475-W-110/2×12SFW3200-10/17302008.11
16Rekuhe II HEPP, Sichuan2×5000270CJA475-W-130/2×14.5SFW5000-12/21502008.12
17Rekuhe III HEPP, Sichuan2×6500321CJA475-W-140/2×14.5SFW6500-12/21502008.12
18Pingdenghoushan HEPP, Sichuan2×5000316CJA237-W-118/2×12.8SFW5000-10/21502009.08
19Shangengzi II HEPP, Sichuan2×8000490CJA237-W-145/2×11.5SFW8000-10/26002009.09
20Bajiaohe I HEPP, Yunan3×5000500CJ550-W-118/2×9SFW5000-8/21502009.01
21Zhoubigou II HEPP, Sichuan2×6300380CJ323-W-129/2×11SFW5000-10/21502010.01
22Huangkunshan HEPP, Sichuan3×3200224CJA475-W-120/2×13.3SFW3200-12/21502011.3
23Zijihe HEPP, Yunan3×5000560CJ550-W-120/2×8.5SFW5000-8/21502011.05
24Kazi HEPP, Sichuan2×6750295CJA475-W-137/2×15.5SFW6750-12/26002012.9
25Haozigou III HEPP, Sichuan2×8000490CJ325-W-145/2×11.5SFW8000-10/26002016.03
26Haizi II HEPP, Sichuan2×5000788CJ1050-W-149/2×6.5SFW5000-8/21502020.06
27Longtou HEPP, Sichuan2×12000855CJ1050-W-156/2×9.2SFW12-8/26002020.09
Horizontal Single Runner 3 Nozzles Pelton Turbine
No.Name of plantCapacityHead WaterTurbine ModelGenerator ModelCompleted
 time
(KW)(M)
1Sanchahe HEPP, Sichuan1×5000250CJ325-W-126/3×12.5SFW5000-12/21502015.9
2Bayi HEPP, Abazhou, Sichuan2x10000451CJ496-W-142/3x11.3SFW10-10/2600Producing
3Longtou HEPP, Ganzizhou, Sichuan2x10000615CJ550-W-132/3x11SFW10-8/2600Producing
4Dabaishu HEPP, Abazhou, Sichuan2x12000475CJ496-W-146/3x11.6SFW12-10/2860Producing
Horizontal Double Runners 4 Nozzles Pelton Turbine
No.Name of plantCapacityHead WaterTurbine ModelGenerator ModelCompleted 
time
(KW)(M)
1Huodi HEPP, Sichuan2×80003402×CJA475-W-122/2×11.2SFW8000-10/26002009.01
2Ningjiahe HEPP, Xinjiang2×60002322×CJ322-W-122/2×12.5SFW6000-12/21502009.05
3Lianghekou HEPP, Sichuan2×150004322×CJ325-W-139/2×12.3SFW15-10/28002013.2
Horizontal Double Runners 6 Nozzles Pelton Turbine
No.Name of plantCapacityHead WaterTurbine ModelGenerator ModelCompleted
 time
(KW)(M)
1Mafanggou I HEPP, Sichuan3×80002362×CJA475-W-122/3×11.8SFW8000-12/26002012.8
Vertical 2 Nozzles Pelton Turbine
No.Name of plantCapacityHead WaterTurbine ModelGenerator ModelCompleted
 time
(KW)(M)
1Sanqiutian HEPP, Yunnan2×6000460CJA237-L-146/2×10.5SF6000-10/28602002.11
2Duoluo HEPP, Sichuan2×13750890CJ1050-L-160/2×9.8SF12-8/28602015.07
3Tianhu II HEPP, Guilin2×150001022.4CJ1050-L-170/2×9.5SF15-8/28602015.09
Vertical 4 Nozzles Pelton Turbine
No.Name of plantCapacityHead WaterTurbine ModelGenerator ModelCompleted
 time
(KW)(M)
1Xiaogou HEPP, Sichuan2×30000938CJ1050-L-163/4×9.5SF30-8/32502010.03
2Nianke HEPP, Sichuan2×10000445CJ325-L-140/4×10SF10-10/28602012.08
3Yinglin HEPP, Sichuan2×8500319.7CJ325-L-120/4×11.5SF8500-10/28602012.07
Vertical 5 Nozzles Pelton Turbine
No.Name of plantCapacityHead WaterTurbine ModelGenerator ModelCompleted
 time
(KW)(M)
1Wangbao HEPP, Sichuan1×6300185CJ475c-L-145/5×13.5SF6300-16/26002015.5
Vertical 6 Nozzles Pelton Turbine
No.Name of plantCapacityHead WaterTurbine ModelGenerator ModelCompleted
 time
(KW)(M)
1BC HEPP, U.S.A1×5200228.6CJ285-L-114.3/6×10N/A2011.12
2Gequhe II HEPP, Qinghai2×27000374.2CJ285-L-155/6×15SF27-12/39002012.08
Francis Turbine
No.Name of plantCapacityHead WaterTurbine ModelGenerator ModelCompleted
 time
(KW)(M)
1Wangjiahe HEPP, Shaxi3×3200160HLA253-WJ-71SFW3200-6/17302004.01
2Yunhe HEPP, Guangxi3×125088HLA339-WJ-60SFW1250-6/11802006.01
3Dazhanghe II HEPP, Guangxi1×400092HLJF2503-LJ-88SF4000-8/21502008.03
4Wanping HEPP, Sichuan2×4000152HLA542-WJ-100SFW4000-8/17302008.07
5Mujiahewula HEPP, Guizhou2×100061.5HLA696-WJ-55SFW1000-6/11802008.08
6Xinglongrize HEPP, Sichuan2×2500100HLD46-WJ-71SFW2500-6/14302008.09
7Zhuomujiu HEPP, Yunnan2×2500178HLD54-WJ-80SFW2500-6/14302008.09
8Furonghe HEPP, Guilin2×12500200HLA542-LJ-150SF12.5-10/28602008.11
9Pingshuijiang I HEPP, Guangxi2×160090HLD46-WJ-65SFW1600-6/14302009.09
10Leju HEPP, Guizhou1× 2500156HLD54-WJ-80SFW2500-6/14302010.8
11Feishuiyan HEPP, Sichuan2× 1000120HLD54-WJ-65SFW1000-6/11802010.06
12Pingshuijiang I HEPP, Guangxi2×160090HLD46-WJ-65SFW1600-6/14602011.4
13Junshan I HEPP, Guilin2×320030.5HL240-LJ-140SF3200-20/32502014.3
14Qishuping HEPP, Sichuan2×1600165HL90-WJ-71SFW1600-6/14302015.5
15Dongtoutian HEPP, Guilin3×125049.6HLA551-WJ-60SFW1250-6/11802016.12
Kaplan Turbine
No.Name of plantCapacityHead WaterTurbine ModelGenerator ModelCompleted
 time
(KW)(M)
1Shiniuzui power plant, Sichuan2×200013ZDJP502-LH-180SF2000-24/26002008.09
2Yashui HEPP, Nanning3×12508.5ZD283/400-LH-180SF1250-24/26002015.3
3Shuikou HEPP, Nanning3×12508ZD283/400-LH-200SF1250-28/26002015.4
4Shuikou HEPP, Nanning1×9008ZD283/400-LH-180SF900-28/26002015.04
5Tuhuangshui power plant, Sichuan2×320011.9ZZ660-LH-230SF3200-28/36002010.08
6Daheba HEPP, Sichuan2×25006ZZ400-LH-305SF2500-44/45002010.12
7Zhongjuntan HEPP, Guangxi2×450012.5ZZ283/400-LH-250SF4500-28/39002015.4
Foreign Projects
No.Name of plantCapacityHead WaterTurbine ModelGenerator ModelCompleted
 time
(KW)(M)
1Chile HEPP, Chile1×1200190CJA237-W-92/2×9.2SFW1200-10/14302009.03
2Ricardo HEPP, Chile1×2000188.6CJ325-W-110/2×11.8SFW2000-12/17302010.05
3Hidrolenna HEPP, Chile3×2200195CJ325-W-112/2×12SFW2200-12/26002010.01
4Mancahuara HEPP, Peru1×1600248CJA475-W-105/2×9SFW1600-12/17302010.01
5PCH HEPP, Peru1×168028HLA551C-W-105SFW1680-14/17302011.01
6Additional Capacity, Canada1×4250298CJ475-W-105/1×12.5Efficiency Improved Runner2009.05
7Mears HEPP, Canada1×3800311CJ325-W-100/2×11.5Efficiency Improved Runner2012.05
8BC HEPP, U.S.A.1×5200228.6CJ285-L-114.3/6×10Efficiency Improved Runner2011.12
9Baker HEPP, U.S.A.1×1650231CJ237F-W-670/3×8.0Efficiency Improved Runner2019.01
10Beaver #4 HEPP, U.S.A.1×1200278.5CJ496-W-132.1/1×10.5Efficiency Improved Runner2018.02
11Beaver #3 HEPP, U.S.A.1×630102.6CJ325-W-113/2x10.5SFW630-20/14302018.08
12Lassen Lodge HEPP, U.S.A.1×5350261.2CJ325-W-143/2×15SFW5350-16/21502015.7
13Talla Bun HEPP, New Zealand1×2150240CJ325-W-103/2×10.5SFW2150-10/17302010.05
14CEVHERS I HEPP, Turkey2×4540304CJ325-W-139/2×12.5SFW4540-12/21502009.11
15CEVHERS II HEPP, Turkey2×3450296CJ325-W-115/2×11SFW3450-10/17302009.11
16Yasil HEPP, Turkey2×160047HLA616-WJ-75SFW1600-8/14302010.07
2×800HLA616-WJ-55SFW800-6/1180
17Havva HEPP, Turkey3×228039.87HLA551C-WJ-92SFW2280-10/17302010.04
18Georgia International Energy3×4000289CJ322-W-130/2×12.4Efficiency Improved Runner2009.01
19Sanhua Jidian HEPP, Indonesia2×180042HLA551-WJ-84SFW1800-10/17302009.02
20Keo Bac HEPP, Vietnam2×900304.2CJ325-W-70/2x6SFW900-6/11802013.05
21JHANG HEPP, Pakistan3×5000403CJ325-W-135/2x10.5SFW5000-10/21502020.02
22KHAN-ABAD-II, Afghanistan3x346717.24ZZD471-LH-185SFW3467-20/3250Producing
 
C. Parts of Equipment:
1. 5m Vertical Lathe F
Pelton Turbine/ Hydro Turbine Generator Unit/ Water Turbine Generator Unit
2. 10m Horizontal Lathe
Pelton Turbine/ Hydro Turbine Generator Unit/ Water Turbine Generator Unit
3. Boring Machine
Pelton Turbine/ Hydro Turbine Generator Unit/ Water Turbine Generator Unit
4. 50T Travelling Crane
Pelton Turbine/ Hydro Turbine Generator Unit/ Water Turbine Generator Unit

D. Patent Technology
Pelton Turbine/ Hydro Turbine Generator Unit/ Water Turbine Generator UnitPelton Turbine/ Hydro Turbine Generator Unit/ Water Turbine Generator Unit

E. After Market:
LISONG has a powerful team of installation and after-sales service built with experienced engineers, senior technicians and skilled workers. The team are quite skilled with installing, commissioning, maintaining, etc, which helps to built the bridge of reliability and friendship between customers and Lisong.
Normally when you are requiring, please let us know the details as follows, then we can provide the correct price for you.
1. Water head:___m
2. Water flow:___m³/s
3. Unit Capacity: ___kw
4. Number of unit:___set
5. Frequency: 50Hz or 60Hz

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours